Data Centers
On-Site Powerplant = Faster Grid Connection
-
Improved Utility Timelines
Terraflux can locate powerplants on-site and enable you with the capacity requirement of your grid interconnection, faster than utility-led Network Upgrades.
-
Lower Risk
By enhancing the data center’s new interconnection rather than replacing it, Terraflux offers a second, local source of power, without gas turbine lead-time risk.
-
No Additional Water Demand
Water is scarce in the western US, and Terraflux powerplants use non-potable water, often sourced off-site from wastewater producers.
-
Ready to Scale with the Data Center
As the data center grows in size and energy demand, Terraflux powerplants can modularly scale up right alongside it.